US$ 20.00
MIP X-Duty™ Rebuild Kit
First appearing in the late 1990s
615 USN Light Ghost Grey Waterbased Surface Primer
These locomotives were constructed between 1916 and 1920 where 238 B6sb's were built
aluminum (upper and lower)/ motor mount spacer/ hardware
BLI 6717 HO Scale Class S2 4-8-4 Northern Steam Loco Great Northern GN 2586 Hybrid Paragon4 DCC ESC Receiver Combo MIP X-Duty™ Rebuild KitBLI 6717 HO Scale Class S2 4 8 4 Northern Steam Loco Great Northern GN 2586 Hybrid Paragon4 DCC In March and April of 1930, the Great Northern Railway received fourteen 4 8 4s from Baldwin and assigned them to the S 2 class, numbering them 2575 through 2588. The S 2s were designed and built to haul passengers on the GN mainline, pulling the Empire Builder and the Oriental Limited. They were assigned to the Montana division for service between
US$ 20.00
US$ 799.50
US$ 25.99
US$ 199.50
US$ 164.00